| EPC Project – Cristal Nitrogen and Oxygen Pipelines at GAS Yanbu. |
||
| SCOPE : Site survey, soil test, design & engineering, project management / coordination, procurement, construction, testing & commissioning of 20”/16”/12”/10”/6”/4” Gaseous Nitrogen (GAN) and Gaseous Oxygen (GOX) Pipe lines to be construction from GAS YANBU to CRISTAL YANBU, YANSAB & NATPET. | ||
| CLIENT : SSL/GAS Yanbu, Abdullah Bishi Bharat Kothari | ||
| General Construction Services for SADAF | ||
| (Work includes, but not limited to insulation works, fireproofing works, maintenance of existing equipment, pumps, vessels, columns, piping and valve boxes, construction and repair works for concrete foundations.) | ||
| CLIENT : SSL/GAS Yanbu, Abdullah Bishi Bharat Kothari | ||
| General Construction Services | ||
| Civil, Mechanical, Electrical, Instrumentation and Insulations works for SADAF Company “On Need Basis”. | ||
| CLIENT : SSL/GAS Yanbu, Abdullah Bishi Bharat Kothari /SSL /SADAF Hashim | ||
| PROJECT VALUE : 7.602 million SR | ||
| Upgrading of Sea Water Piping System at Yanpet. | ||
| Mechanical and Piping Work, Civil Concrete/ Structural Work, Instrument and Electrical Work and Painting Work | ||
| CLIENT : SSL/Zafar Qureshi | ||
| Installation of Conveyor Belt at SADAF SALT PLANT. | ||
| Scope covers: | ||
| a) Civil Works – Topographic survey, Relocation of
existing salt stockpile, Site Preparation, Paving, Access Roads etc, Excavation
& Preparation for new foundations, Concreting, Modification of existing
foundations, restoration of damaged paving, grading etc. b) Structural Works – Fabricate & erect structural steel, Ceramic coated bolts, FRP Grating & handrail fabrication and erection, demolition of redundant structures. c) Mechanical/Piping Work – Conveyor installation & commissioning, Piping. d) Electrical – Installation of 3 sections of MCC, Installation of cable tray, installation of cable tray support, Installation of dry type transformer, fabrication of frame, Installation of lighting panel, conduit fittings inside MCC room, Power cable laying through cable tray, control cable laying, flood light stanchion mounting, flood lighting, Installation of local control station, CTB, demolition work, Terminations etc. |
||
| CLIENT : SSL/SADAF SALT PLANT, Santhosh K. Pillai | ||
| Installation of Sea Water Supply and Return Line. | ||
| (Work covered but not limited to Excavation for the installation
of lines to a depth of 6 meters, installation of sheet piling and shoring
by use of vibratory hammer. Installation of 2 meter dia, 7.5 meter long
pre-stressed concrete pipe spools each weighing 26.5 tons. Total length
is more than 3000 meters. Installation of pipes in two rows for supply and
two rows for return. The interlock of pipe spools is by pressure lock by
two 'O' ring methods. The excavation dimensions for the trench are 3000
meter long by 6 meter deep by 9 meter wide.) Supply, install and test 15kV,
3x1/C x 500mm2 copper conductor etc., Supply, install and test cable splices
on feeder No. 15, CKT : 3 – 15008., Supply, install and test 15kV
outdoor type cable termination kits, Supply, install and test Utilization
Distribution Panel, Supply, install and test the lighting fixtures, conduits,
poles, switches, receptacles, with all fittings, clamps and accessories. Instrumentation and Control: Procurement, supply, installation, testing and commissioning of the field instruments, panels, cables and accessories and erection materials etc. |
||
| CLIENT : SSL/ HADEED - Awabed Ssang Young Ltd., Jubail, Mr. Yeon-Seon Kang | ||
| General Construction Services | ||
| AROMAX Benzene and Cyclohexane Facilities | ||
| (Work includes but not limited to Survey, fabrication of pipe spools, supports, installation of new piping, ¾” to 12” dia. approx. 1100 meters, work on five exchangers, drums, vessels including removal & install, installation of new absorber vessel, surge tank vessel varying form approx. 1.5 ton – 70 ton weight and up to 26 meter height, installation 15 HP pumps, valves (control, ball, gate), instruments and its associated DCS work including cable pulling & etc.) | ||
| CLIENT : Saudi Chevron Philips Petrochemical, Jubail, Mr. Cecil Christian | ||
| PROJECT VALUE : 9.000 Million SR Approx. (Unit Rate Contract) | ||
| Civil Works and Cathodic Protection works - SCP Aromax Benzene and Cyclohexane and Off Plot Facilities. | ||
| (Work includes, civil works of heavy excavation of 15 ft
deep & across pipeline corridor for connection remote power house and
filling for exposing underground pipelines from Ras Tanura to Jubail SCP
for cathodic protection and associated with electrical/instrumentation and
cathodic protection cable trench, lighting pole installation, tarmac restoration
and conduit fireproofing.) e) Instrumentation – Installation of CMS Provided instruments, weighing scale, conveyor belt alignment switch, safety switch, zero speed switch, time delay relay, start-up horn, beacon, installation of 2 junction boxes, installation of relay panel, install field JB, Control cable, instrument cables, DCS wiring, installation of control devices, bifurcation chute, control valves pressure transmitters orifice plates, piping & tubing, loop checking etc. |
||
| CLIENT : Saudi Chevron Philips Petrochemicals / SA Kent, Jubail | ||
| SADAF Expansion – Styrene II Project | ||
| (Civil Works: Complete Civil work of the expansion completed within a record time with a very critical time schedule of Evaporation pond backfilling, earthen tank foundation 4 Ea., heavy filling for foundations, road construction, area grading & paving, and dike constructions). | ||
| RTR Works : Installation of RTR Piping and fixtures from
2” Dia to 24” Dia, Fabrication of field meter joints, testing
and commissioning of different sewer systems, including construction and
installation of RTR lined concrete man holes (Approx. concrete quantity
was 300 M³) pipe laying etc. (Mechanical Works: Approx. 4000 Tons of structural steel erection including welding of plates 30000 dia. Inch of heavy wall pipe welding for the pipe erection on the field.) |
||
| CLIENT : SSL / SADAF – Daelim, Jubail | ||
| SADAF Upgrade Project – UOC Civil and U/G Utilities | ||
| 1. Civil Works: Pipe way foundations, Vessel foundations, Pump foundations, Heavy equipment foundations, Foundations with drilled piers, Water Retaining Structure, Sea water structure 2. Mechanical Works: 66” Ø sea cooling water line (SCW), 60” Ø closed loop cooling water (CLCW) line, 48” Ø concrete cylinder pipe, 4” - 12” Fire water lines, Oily water sewer system and storm water sewer system, Sanitary sewer. |
||
| CLIENT : SSL. / SADAF – BRSL, Jubail Mr. Paul Derrick Mr. I. A. Al-Naimi | ||
| Install all OSBL Tie-ins and facilities
to support Co-Generation Utility Requirement at SADAF. |
||
| The scope of work includes Mechanical, Civil, Electrical & Instrumentation. | ||
| 500 tons of Galvanized Structural Steel Fabrication & Erection of Pipe Racks, Pipe Bridges. | ||
| 4000 m of Pipe fabrication & Erection which includes Poly propylene piping, HP Steam piping, Post weld heat treatment, insulation, valve installation, Tie-ins and Hot taps. | ||
| 475 cubic meters of concrete supports and valve boxes. | ||
| Erection of equipments such as Pumps, Motors, Heat exchangers, Air Coolers. | ||
| • Blowdown • Potable water • 30” / 24” Sch. 60 - H.P. Steam Line • Closed loop cooling water return and supply • H.P. Boiler feed water • Chemical Waste • Domestic Water • Plant Water |
||
| CLIENT : SSL / SADAF, Tariq B-Dahbi SSL Abdullah Al-Bishi | ||
| Civil Work and other Services for the Debottleneck and Revamp of Aromax, Benzene and Cyclohexane Facilities. | ||
| Scope of Work Covers: | ||
| Concrete foundations, drilled shafts, embeds – anchor bolts, rebar, reinforcement wire/mesh, sole/sliding plates, excavation, piling, shoring, dewatering, fill, seal slabs, compaction, sealing/painting concrete, vapor barrier, , pre-cast, clearing, grubbing, drainage, paving, walkways, roads, parking areas, installation of all non-pressurized or atmospheric underground pipe and associated equipment such as catch basins, sumps, manholes, culverts, Pipe tie-ins, steel pipe welding, coat and wrap for metallic pipe, installation of fire water pipe and associated equipment, etc. | ||
| CLIENT : SAUDI CHEVRON, Jubail. Mr. Nasser H. Al-Shahrani | ||